Project Name :
Atuf Facilities Upgrade
Client : TotalFinaElf
Location : Atuf, Yemen
Awarded Date : May, 2001
Completion Date : November, 2001
Project Scope : Engineering, Procurement, Supply, Construction, and Commissioning.
Work Disciplines : Civil, Mechanical, Structural, Tankage, Piping, Pipelines, Electrical, Instrumentation, Painting.
This project was awarded to HAWK INTERNATIONAL in a Joint Venture with MIS, who are responsible for the majority of the Engineering and Procurement.
Plant work involved process and design engineering, procurement of the majority of materials with some equipment being supplied by the Client. Plant works involved the construction of produced water injection facilities, addition of two crude oil storage tanks of 6000 BBL each, addition of water tank and fire water system and two new crude oil shipping pumps, manifolds and piping, erection of vessels, pump installations, modification of MCC room to allow integration of the new future facilities, modification of process control and ESD system, integration of new and future facilities in Atuf CPU existing facilities including for interfaces with temporary installed EPF and all associated electrical and instrumentation works.
This work all was supervised by a HAWK INTERNATIONAL construction team including full onsite planning, site engineering, material and quality control support.